Railway technology-projects
Unterinntaltunnel link site
Soft heating at the Gotthard Base Tunnel
26 years of experience in the design, planning and tendering of electrical equipment for railway infrastructure
358 grounding plants
283 stations and stops
272 transformer stations
142 Soft heating systems
93 GA plans
86 tunnels, of which currently the longest tunnel in Europe, 34 km of Brenner access area
42 track field lighting systems
42 highly available power supply UPS
36 Network planning
16 maintenance plants and depots
9 rail power supply 50 Hz, 16.7 Hz, DC
6 transmission systems
4 train preheating systems
1 multi-voltage test equipment and test hall for Bombardier